Project Name: UZMTO
– Gas to Chemical Complex
Client: MTO Gas Chemical Complex, Enter Engineering,
UZLITI Engineering
Location: BUKHARA
REGION, Republic of UZBEKISTAN
Contract Start Date:
21, November 2023
Project Description:
The project envisages the construction of a new Gas to Chemicals Complex (GCC),
to be constructed on the territory of Bukhara Region, Republic of Uzbekistan.
The Gas to Chemicals Complex
(GCC) will process natural gas delivered via pipeline, using Syngas to Methanol
and Methanol to Olefins technologies to produce ethylene and propylene
derivatives.
Besides, another part of the
plant is considered to receive Naphtha as a feed stream to increase the
ethylene and propylene production capacity in the complex.
M and S Scope of Work:
Piping 3D model and related
activities (Stress analysis, Modeling Structures and Cable trenches and trays),
Exporting reports and drawings for below units:
Unit 22: Demineralized Water
Production
Unit 25: Condensate Recovery
Unit 26: Cooling Water
Unit 51: Chemical Storage
Unit 52: Methanol Storage
Unit 53: MTO By-Product Storage
Unit 54: Ethylene & Propylene
Storage
Unit 55: Butene-1 Storage
Unit 56: VAM Storage
Unit 57: EG Storage
Unit 58: Hydrogen Storage
Unit 59: Para-xylene Storage/Acetic
Acid Storage
Unit 82: Naphtha Storage
Unit 83: NCU By-product storage
Unit 84: Hexene-1 Storage
Unit 85: Isobutane Storage
Unit 71: Interconnecting
Piperacks and UG lines