UZMTO Gas to Chemical Complex

Project Name: UZMTO – Gas to Chemical Complex

 

Client:  MTO Gas Chemical Complex, Enter Engineering, UZLITI Engineering

 

Location: BUKHARA REGION, Republic of UZBEKISTAN

 

Contract Start Date: 21, November 2023

 

Project Description: The project envisages the construction of a new Gas to Chemicals Complex (GCC), to be constructed on the territory of Bukhara Region, Republic of Uzbekistan.

The Gas to Chemicals Complex (GCC) will process natural gas delivered via pipeline, using Syngas to Methanol and Methanol to Olefins technologies to produce ethylene and propylene derivatives.

Besides, another part of the plant is considered to receive Naphtha as a feed stream to increase the ethylene and propylene production capacity in the complex.

 

M and S Scope of Work:

Piping 3D model and related activities (Stress analysis, Modeling Structures and Cable trenches and trays), Exporting reports and drawings for below units:

Unit 22: Demineralized Water Production

Unit 25: Condensate Recovery

Unit 26: Cooling Water

Unit 51: Chemical Storage

Unit 52: Methanol Storage

Unit 53: MTO By-Product Storage

Unit 54: Ethylene & Propylene Storage

Unit 55: Butene-1 Storage

Unit 56: VAM Storage

Unit 57: EG Storage

Unit 58: Hydrogen Storage

Unit 59: Para-xylene Storage/Acetic Acid Storage

Unit 82: Naphtha Storage

Unit 83: NCU By-product storage

Unit 84: Hexene-1 Storage

Unit 85: Isobutane Storage

Unit 71: Interconnecting Piperacks and UG lines